This information that was provided allowed for quantity take-off information for procurement of materials and provides support to the field on execution of the construction plan.
The “team” would provide additional system information and costs in the aid of project costs estimation.
Security Upgrade to the United States Embassy
Rome Italy
SEA key personnel were responsible for coordinating the architectural and engineering firms to complete a site survey of the US Embassy. 
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
March 2004 Security Upgrade to the United States Consulate
Milan Italy
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate. The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits. Once the information had been gathering, the
team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design
and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Consulate
Florence Italy
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Consulate
Naples Italy
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States
Consulate Nagoya Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States
Consulate Fukuoka Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States
Consulate Sapporo Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Consulate
Yokohama Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Consulate
Osaka Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Consulate
Nagoya Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy
Tokyo Japan
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy
People’s Socialist Republic of Viet Nam
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Consulate
To the People’s Republic of China
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Consulate.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy
Republic of India
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy
Republic Islamique of Mauritania
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy
Rwanda,
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy in war torn Rawanda.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Office
Kosovo
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Office.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy
Macedonia
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs and standards. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade United States to the Embassy
Albania
SEA key personnel were responsible for coordinate the architectural and engineering firms to complete a site survey of the US Embassy.
The team leader was responsible to travel to sites to inspect and gather information that would aid in the development of a Scopes of Work (SOW) derived from the site visits.
Once the information had been gathering, the team would oversee review of design and implement changes to meet the DoS’s needs. These needs would include oversight and management of Project development and site integration, survey design and construction management.
Once the package was developed for the DoS the team would oversee bid development and execution, delivery of Task Orders requirements and coordinate deliverables to the Department of State.
Security Upgrade to the United States Embassy,
Kyrgyz Republic
SEA team support was made responsible for the overall operation, completion and compliance of security upgrade for the US Embassy in the Kyrgyz Republic. The team leader was responsible to manage a multi-million dollar cash project, including accounting and distribution of funds in a former Soviet Republic. The team leader had to establish contractual agreements between subcontractors and construction management using interrupters and foreign contractors. The scope of work included supervises hiring of foreign management personnel.
The project included the responsibility to oversee the coordination and installation of government supplied specialty security equipment. This installation also included the design and engineering of the equipment installation, including field redesign and alternate manufacturing methods to successfully complete the project.
The field personnel had to supervise all security requirements which included serving as the Contractual liaison between office management and US Government personnel which meant the overseeing of compliance with QA/QC self regulation and safety plan for the operations.
Security Upgrade, United States Embassies
Worldwide.
SEA key personnel had the responsible for the review, modification and acceptance of drawings and designs for construction and compliance of security upgrades for US Embassies.
The Scope of work for this project included engineer, design and overseeing necessary changes to ensure proper compliance with the Compendium of Design Standards for the DoS. The work included coordination of the release of design changes to the field to assure correct and current information for the building process. The team had to supervise necessary changes to the facility design to assure compliance with the Scope of Work (SOW), contractual requirements and the security regulations.
The team members had to visit sites to establish a comprehensive plan for development of facility design which included incorporating changes made through the site visits to refine the site plans, construction details and the additions of the Scope of Work (SOW).
The team leader also had to meet with potential sub contractors to discuss parameters of the project, coordinate costing and local restrictions and their impact on project profitability with Estimating Staff. The staff was required to write RFIs, Differing Site Conditions and Change Orders in a clear and precise language to eliminate costly misinterpretations and the team created shop drawings detailing proper placement and installation of required specialty security equipment.
Additional Projects and Assignments Additional projects and assignments are available upon justification and an established “need to know” criteria has been acknowledged and verified.